1074 wood processing in the region starts
La sobrietà come strategia commerciale dal 1972.
1074 wood processing in the region starts
1874 Start of industrial regional wood processing in Admont
1923 Sawmill built at current location
1972 Establishment of Admonter Holzindustrie AG
1979 Development of the natural wood panel
1985 Briquetting for recovery of wood by-products
1987 Birth of the first natural wood floor
1998 Two biomass boilers with a total of 7 MW district heating network taken into operation
1999 1. electricity self-generation ORC with 400 kW
2001 Start of own apprenticeship training
2003 Admonter is PEFC-certified
2004 Final end of fossil gas firing
2006 expanding the biomass boilers by 5 MW
2007 2. electric self-generation ORC with 800 kW
2008 filter system for all biomass boilers
2009 1. Admonter LCA cradle to factory gate
2013 Commissioning of a 650 kWp photovoltaic plant on the roofs of the factory halls
2015 Connection to rail transport
2016 EPD of all products manufactured in Admont
2017 Austrian Ecolabel
2019 Listed at the German institute for healthy living „Sentinel Haus Institut“
2020 100% of the electricity supplied derives from sustainable sources
2021 Room concepts made of natural wood for floors, walls and ceilings
Fondazione: 1972
Proprietà: Abbazia Benedettina di Admont
Consiglio di amministrazione: Gerhard Eckhart
Dipendenti: ca. 250
Fatturato: 71 Mio. € (2022)
Prodotti: Tavole in legno per la pavimentazione trattate con sistema naturale, pannelli da rivestimento in legno naturale.
Marchio: Admonter
Percentuale dei prodotti esportati: 70%, Mercati principali: Austria, Germania, Italia, Svizzera
Tipologia di clienti: Rivenditori, architetti e progettisti